yEnergy

The YCDCo on site solar system was installed in 2014 and continues to reliably generate renewable energy that meets a significant proportion of our daytime electricity needs. This installation was a join venture with the Yackandandah Folk Festival, with 3kW of the total 12kW capacity funded by the Festival in order to offset its annual carbon emissions.

You can track the performance of our system online via out PVOutput page.